Tuesday, November 10, 2009

The frame begins

Joe and the boys made a start on the frame on Monday, and already we have a first floor! It was really awesome to be able to walk on the slab when the rooms had been mapped out in 2D, we started to get a real feel for how the dimensions of the rooms would be. Then, we pop over today to find our frame is now 3D! We could actually walk through the rooms and see where each of the walls, windows and doors would be. Joe has had a great idea to put a two-sided fireplace in the theatre/family room. It would look so awesome so we need to look into the $$$!! We need to make a decision pretty soon as all of the structural elements of the house will be finalised by the end of the week. Tomorrow they are planning on finishing the windows, then its on to the 1st floor! Given the pace they have been working at, it looks very likely that we will be up to Lock Up stage by Christmas. Things will get slow after that as each of the tradies take their Christmas break :)

1 comment:

  1. Once a frame been made, we all gets some hints of how the home will be looking after completed entire work. You must got felt like that.
    mkv file player

    ReplyDelete